Skip to main content

Mubuku Prison farm Irrigation System

Consultancy services on Environment and Social Impact Assessment (ESIA) for the detailed engineering design of Mubuku Prison farm Irrigation System.

Activities Carried Out
Developing an inception report for the client detailing the initial assessment and the approach required for the assignment; Desk review of relevant literature and developing data collection tools; Conducting site visits to the raw water abstraction point, the pumping site, treatment station, the reveservor tank site and the pipeline route to identify environmental impacts and set mitigation measures; Conducting community meetings as part of the consultation process and public invlovement; Identification and Evaluation of Negative Environment Impacts; Developing mtigation measures for the identified mitigation measures; Drafting an EIA scoping report for the client and responding to the clients comments; and Generating a final report.

Potfolio Category

  • ESIA - OPUs

    Environmental and Social Impact Assessment for Other Projects Undertaken (ESIA - OPU)